On October 12, the CCSD Board of Education voted to sell off Barnet School's 1989 John Deere tractor. For parties/individuals interested in purchasing the equipment, please submit proposals to:
Tommy Bricco, CCSU Director of Facilities & Operations
thomas.bricco@ccsuvt.net
Subject Line: Barnet School John Deere TractorProposal Bids are due via email by 2:00 PM, November 2, 2026.


-
The existing switchboard, 277/480 V was originally installed with the 1957 addition to the Danville School and was rated in “poor” condition, and is anticipated for lifecycle replacement per the 2023 Bureau Veritas State Inspection report. The CCSU seeks qualified bidders to replace and install a new switchboard.
All proposals shall be emailed or delivered by December 11th, 2026, by 2:00 PM, to the address or email listed below. Proposals must be delivered to and received before the deadline. There will be no exceptions. Proposals received after the deadline will not be considered.
Attn: Tommy Bricco, Director of Facilities
10 Route 2 West, Danville, VT. 05828
Email: thomas.bricco@ccsuvt.net -
Furnish and install a new synthetic polymer gym floor for athletic and multi-purpose use of the space.
All proposals shall be emailed or delivered by December 21st, 2026, by 2:00 PM, to the address or email listed below. Proposals must be delivered to and received before the deadline. There will be no exceptions. Proposals received after the deadline will not be considered.
Attn: Tommy Bricco, Director of Facilities
10 Route 2 West, Danville, VT. 05828
Email: thomas.bricco@ccsuvt.net -
Based on the 2023 Bureau Veritas State report, the windows on this section of the building have exceeded their useful life. We would like to solicit bids to have 18 windows along the middle school hallway replaced with new thermal double glazed windows.
All proposals shall be emailed or delivered by December 18th, 2026, by 2:00 PM, to the address or email listed below. Proposals must be delivered to and received before the deadline. There will be no exceptions. Proposals received after the deadline will not be considered.
Attn: Tommy Bricco, Director of Facilities
10 Route 2 West, Danville, VT. 05828
Email: thomas.bricco@ccsuvt.net -
Based on the 2023 Bureau Veritas State report, the existing vinyl tile throughout the building was listed in “poor condition” and recommended to be replaced in 2023. The CCSU would like to solicit bids to replace the existing tile with Vinyl (VCT) tile throughout the building.
All proposals shall be emailed or delivered by December 18th, 2026, by 2:00 PM, to the address or email listed below. Proposals must be delivered to and received before the deadline. There will be no exceptions. Proposals received after the deadline will not be considered.
Attn: Tommy Bricco, Director of Facilities
10 Route 2 West, Danville, VT. 05828
Email: thomas.bricco@ccsuvt.net